
The Story
New in factory vacuum sealed plastic.
About this item
- Individual Pocket Spring: Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
- Vesgantti Luxury Support System: Memory foam and pocket spring support system also provide more buffers for your body, help relieve back pain, greatly improve your sleeping quality
- Breathable and Healthy: Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, fiberglass-free, cooling, breathable and comfortable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
- Ultra Quiet: Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
Item B08BY9F77Y
SKU 8211

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.
Description
New in factory vacuum sealed plastic.
About this item
- Individual Pocket Spring: Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
- Vesgantti Luxury Support System: Memory foam and pocket spring support system also provide more buffers for your body, help relieve back pain, greatly improve your sleeping quality
- Breathable and Healthy: Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, fiberglass-free, cooling, breathable and comfortable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
- Ultra Quiet: Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
Item B08BY9F77Y
SKU 8211






